Illustration, AI-generated from the story text. Tap a panel to read the story through it.

Micron has suspended a memory plant in Taiwan budgeted at $3 billion to $4.5 billion because of a prolonged labor dispute, Bloomberg reports. Reuters could not verify it and Micron did not immediately comment. Secondary accounts place the project, Fab 11E, in Taoyuan with operations due in 2028, and say only minimal site work continues.

The Taoyuan union wants 15% of paid in cash. Micron settled with the larger Taichung union in October, and some workers are challenging that deal.

The company says current Taiwan operations are unaffected. Nobody has said whether the pause is temporary. A supplier that cannot meet demand has rarely had more reason to build, which makes this a dispute over who gets the shortage's profits.
Micron stops work on a plant worth up to $4.5 billion in Taiwan during a memory shortage
Micron has suspended a memory plant in Taiwan budgeted at $3 billion to $4.5 billion because of a prolonged labor dispute, Bloomberg reports. Reuters could not verify it and Micron did not immediately comment. Secondary accounts place the project, Fab 11E, in Taoyuan with operations due in 2028, and say only minimal site work continues.
The Taoyuan union wants 15% of operating profit paid in cash. Micron settled with the larger Taichung union in October, and some workers are challenging that deal. The company says current Taiwan operations are unaffected. Nobody has said whether the pause is temporary. A supplier that cannot meet demand has rarely had more reason to build, which makes this a dispute over who gets the shortage's profits. SourcesBBC
Sources
- BMicron pauses work on $4.5 billion Taiwan plant (Reuters via Investing.com)investing.com
- BMicron pauses work on Taiwan plant after labor spat (Bloomberg, read via Reuters)bloomberg.com
- CMicron halts construction (Mezha)mezha.ua
This story ran in the Morning Brief of November 5th 2026.